Boards and sprints

A Kanban board moves cards across columns. Switch it to sprints and its cards are planned from a backlog into timeboxed sprints instead.

Add one from Add › Kanban board. Its Settings hold how it works: its type, its columns and its card fields. A board changes type whenever you like, keeping every card.

Boards

Cards

  1. Choose Add card, give it a title and, if you like, a description, and choose Create card.
  2. Drag a card to another column, or up and down within one, to move it.
  3. Choose a card to open its details beside the board: edit its title, description and fields, attach files, and comment. Full view gives it the whole page.

A card's Activity keeps its comments and every change, with who made it; its History shows each change in full. Deleting a card is in its ⋯ menu.

What someone may do is part of their access: which columns they may add cards to, which moves they may make (each direction its own), and whether they may edit, comment, attach files or delete.

Boards

Columns

Add, rename, reorder and delete columns in the board's Settings › Columns. Each column may also:

  • Count as done: cards there are finished, for sprints and their burndown.
  • Hold at most a number of cards, a work-in-progress limit.
  • Hide cards after some days in the column, or show only the newest few. Hidden cards keep their places, and the column's View all shows them.
  • Send cards on to a column of another board: a card moved here goes on there.

Boards

Card fields

Add the fields your cards need in Settings › Card fields, in the order they show. Each shows on the cards, or only when a card is opened.

FieldHolds
PointsAn estimate, which sprints add up.
AssigneeWho the card is for.
EpicThe larger piece of work it belongs to (see Epics and links).
LinksOther cards it relates to.
FilesFiles attached to it.
Your ownMultiselect, Text, Date, Link type, Person, Tags, Number, each named as you like. A multiselect's values are added in its settings.

Boards

Epics and links

An epic is a card of another board, or of this one: the Epic field's settings choose which board's cards are the epics. Give a card its epic from its details; a card can show an epic you can't open, without its title.

The Links field relates a card to other cards on any board you can open. For a relation with a name of its own, add a Link type field named for it, such as Blocked by. Pick the card from a search of cards by title or board.

Boards

Card numbers

Every card gets a number when it's made, such as T-12. Change the prefix in Settings › General: every card's number is renamed with it, and keeps its number. Search finds a card by its number too.

Sprints

Switch to sprints

In Settings › General, set the board's Type to Sprints. The board then shows the running sprint's cards, and its toolbar opens its Sprints page, where sprints are planned, started and completed.

The sprints page also sets what the board calls a sprint (an Iteration or a Cycle, say), how many days one usually lasts, and its backlog: the column cards are planned from and unfinished cards return to. The backlog may be a column of this board or of any board you can open. Switching without one adds a Backlog column first.

Sprints

Plan a sprint

  1. On the sprints page, choose Plan a sprint, give it a name and, if you like, a goal, and choose Plan sprint.
  2. Under Backlog, plan each card into a sprint from the list beside it.
  3. Plan as many sprints ahead as you like. Edit or delete a planned sprint from its row.

Sprints

Start and complete

One sprint runs at a time. Start a planned sprint and confirm its days: its cards show on the board, and what it holds then is its commitment. When it's over, Complete it and choose where its unfinished cards go: back to the backlog or into a sprint planned next.

Sprints

Burndown and velocity

The running sprint shows its progress and a Burndown chart of what remains each day against the ideal, counted in cards or, once the Points field is on, in points. Completed sprints list what was committed, completed and carried over, and the board's velocity is the average of what its sprints completed.