A Kanban board moves cards across columns. Switch it to sprints and its cards are planned from a backlog into timeboxed sprints instead.
Add one from Add › Kanban board. Its Settings hold how it works: its type, its columns and its card fields. A board changes type whenever you like, keeping every card.
Boards
A card's Activity keeps its comments and every change, with who made it; its History shows each change in full. Deleting a card is in its ⋯ menu.
What someone may do is part of their access: which columns they may add cards to, which moves they may make (each direction its own), and whether they may edit, comment, attach files or delete.
Boards
Add, rename, reorder and delete columns in the board's Settings › Columns. Each column may also:
Boards
Add the fields your cards need in Settings › Card fields, in the order they show. Each shows on the cards, or only when a card is opened.
| Field | Holds |
|---|---|
| Points | An estimate, which sprints add up. |
| Assignee | Who the card is for. |
| Epic | The larger piece of work it belongs to (see Epics and links). |
| Links | Other cards it relates to. |
| Files | Files attached to it. |
| Your own | Multiselect, Text, Date, Link type, Person, Tags, Number, each named as you like. A multiselect's values are added in its settings. |
Boards
An epic is a card of another board, or of this one: the Epic field's settings choose which board's cards are the epics. Give a card its epic from its details; a card can show an epic you can't open, without its title.
The Links field relates a card to other cards on any board you can open. For a relation with a name of its own, add a Link type field named for it, such as Blocked by. Pick the card from a search of cards by title or board.
Sprints
In Settings › General, set the board's Type to Sprints. The board then shows the running sprint's cards, and its toolbar opens its Sprints page, where sprints are planned, started and completed.
The sprints page also sets what the board calls a sprint (an Iteration or a Cycle, say), how many days one usually lasts, and its backlog: the column cards are planned from and unfinished cards return to. The backlog may be a column of this board or of any board you can open. Switching without one adds a Backlog column first.
Sprints
The running sprint shows its progress and a Burndown chart of what remains each day against the ideal, counted in cards or, once the Points field is on, in points. Completed sprints list what was committed, completed and carried over, and the board's velocity is the average of what its sprints completed.
Questions or something missing? Contact us.